Artarmon Data Centre (Project EOS)

Project EOS refers to a proposed data centre that is currently being developed by Goodman located in Artarmon.    

The site provisions for: 

  • 80MVA power capacity 
  • 33 at-grade car parking spaces 
  • 2 loading docks 
  • 5 levels of technical data hall floor space  

Ason Group assisted Goodman in preparing a Transport Accessibility and Impact Assessment (TAIA) to accompany a State Significant Development Application (SSDA) for this development.

Our work included

  • Establish appropriate trip generation rates for data centres to be used for traffic assessment.
  • Future trip demand analysis based on trip generation rates from other data centres.
  • Parking demand forecasts to ensure sufficient parking is provided for a data centre type development.
  • Site Access Design Development to incorporate the trap designs into the site access arrangements whilst also allowing sufficient on-site queue capacity to avoid overflow onto the external network.

Similar Projects

Ason Group was engaged by Haben Property Fund to prepare a Traffic Impact Assessment to support a Planning Proposal for a mixed-use development at 33-43 Phillip Street, St Marys. Further to a proposed amendment to existing FSR provisions, the Site provides an indicative yield of: 584 residential units. 2,200m² GFA

View Details

Station Plaza St Marys

Ason Group has assisted throughout the St Leonards Health Organisation Relocation (SHOR) project, located within the Royal North Shore Hospital Precinct. The project was a State Significant Development and approval was therefore provided by the Department of Planning, Industry and Environment. The SHOR project, which is nearing completion, provides for:

View Details

St Leonards Health Organisation Relocation Project

Ason Group was commissioned to prepare a Transport Assessment in support of a State Significant Development known as the Kemps Creek Warehouse, Logistics and Industrial Facilities Hub. The development provides for: 18 warehouse and distribution lots, with a combined gross floor area of 421, 820m2 Staged delivery of infrastructure Local

View Details

Kemps Creek Warehouse and Logistics Hub