Burrows Road Traffic Modelling Assessment
Transport Modelling
Client: Goodman
Ason Group has been engaged to undertake Traffic Modelling Assessment as a part of Transport Management & Accessibility Plan (TMAP) in support of the State Significant Development Application (SSDA) proposal for an industrial warehouse development at 1-3 Burrows Road, St Peters.
![](https://www.asongroup.com.au/wp-content/uploads/2022/11/Project-Page-Banner-Image-scaled-e1689128083702-1024x768.jpeg)
Traffic Modelling Assessment was prepared to address the relevant Secretary’s Environmental Assessment Requirements (SEARs) issued by the Department of Planning and Environment (DPE).
![](https://www.asongroup.com.au/wp-content/uploads/2022/11/Goodman-Burrows-Road-SIDRA-994x1024.png)
Our work included:
- Liaison with a range of stakeholders, including City of Sydney Council, Department of Planning and Environment (DPE) and TfNSW.
- Collate and analyse the probe data to understand existing network-wide travel times and congestion patterns as well as for model validation.
- Develop, calibrate and validate existing conditions Aimsun microsimulation model.
- Develop Future Base case and Project case AIMSUN models and compare the modelling outcomes.
- Perform SIDRA analysis on the preferred project case to identify the impact to the surrounding road network.
- Preparation of Traffic Modelling Assessment report.
![](https://www.asongroup.com.au/wp-content/uploads/2022/11/Goodman-Burrows-Road-Aimsun-1024x717.png)