Ivanhoe Estate Masterplan

The Master Plan

Ason Group was engaged by Frasers to assist in its bid and subsequent masterplan development of the Ivanhoe Estate, Macquarie Park. The development is Australia’s largest integrated housing project.

The Project included

3,300 new dwellings including 1,078 social and affordable units.

Provision for a new school, child care and community facilities.

New vehicular and pedestrian connection to Lyon Park Road.

Signalisation of the Herring Road with Ivanhoe Place.

Strategic Transport Modelling of existing and future traffic flows under varying development and infrastructure scenarios using Aimsun modelling software.

Our work included

  • Identification of opportunities and constraints during the “Bid” phase.
  • Demand forecast analysis of trips by mode and purpose.
  • Site access and management strategy.
  • Technical design of the road and active transport network.
  • Public transport capacity assessment.
  • Pedestrian modelling focusing on the movement of pedestrian between the Site and Macquarie Park station, and the capacity of pedestrian infrastructure to accommodate peak pedestrian demands.
  • Consideration of Movement & Place within the broader Macquarie Park precinct. Development of a supporting Transport Management and Accessibility Plan with associated Aimsun modelling.
  • Liaison and consultation with all key agencies and stakeholders, including Ryde City Council, RMS, Transport for NSW and Department of Planning & Environment.

Similar Projects

Ason Group has provided Sekisui House with traffic and transport services for the Sanctuary site at 14-16 Hill Road, Wentworth Point since the site was acquired from Urban Growth in 2017. A predominantly residential development providing up to 2,300 dwellings, the site is located immediately adjacent to the Sydney Olympic

View Details

Sanctuary at Wentworth Point

Ason Group was originally commissioned in 2017 to undertake the development assessment of the Master Plan for 45-61 Waterloo Road Macquarie Park, providing for some 117,000m2 of commercial GFA.Subsequently we have also been commissioned to provide Transport Assessments for the first 3 buildings, including Building C (now known as “The

View Details

Waterloo Road

Ason Group was engaged by TfNSW to investigate the Southern Link Road (SLR) design and upgrade options to carry out the concept design, environmental assessment, detailed design and staging for SLR. The concept design has been divided into three stages. Stage 1 connects Mamre Road to Compass Drive Stage 2

View Details

Southern Link Road Corridor Concept Design