Port Botany & Foreshore Drive Aimsun Model

Port Botany in Banksmeadow is Australia’s primary port for bulk liquid and gas and is home to New South Wales largest container facility.  Ason Group was commissioned to prepare a 12-hour Aimsun microsimulation model for Coal Pier Road Industrial Precinct located in the vicinity of Port Botany.

Freight movements are of particular interest for existing and future network planning.  TfNSW investigated multiple “upgrade” options for a sustainable future, with a primary focus on Botany Road and Foreshore Road corridors.  This model enables future development impact assessment and option testing under multiple upgrade scenarios.

Our work included

  • Review demographics, socio-economic data, land-use and transport networks in Banksmeadow.
  • Identify the origin and destination existing trips, local and passing traffic and review existing road network performance.
  • Collate extensive traffic survey and mobile data for the traffic model development.
  • Develop a calibrated and validated 12-hour microsimulation model in Aimsun.
  • Support public sector to review road upgrade options and inform economic, financial analysis and planning for the gateway reviews.

Similar Projects

Ason Group was engaged to undertake the capacity analysis and assess the operational performance of the current and proposed design in terms of Level of Service provided to pedestrian circulation on the block and adjacent streets in Sydney CBD. The Legion pedestrian model was developed to perform virtual experiments on

View Details

Pitt Street Modelling

Ason Group was commissioned to prepare a Transport Management & Accessibility Plan (TMAP) in support of a Planning Proposal at 26 Kissing Point Road and 266 Victoria Road, Parramatta. The Planning Proposal provides for: 2,700 new dwellings. 5,000m2 of retail and commercial floor space. Community facilities, including open space, accessible

View Details

FACS

Ason Group was originally commissioned in 2017 to undertake the development assessment of the Master Plan for 45-61 Waterloo Road Macquarie Park, providing for some 117,000m2 of commercial GFA.Subsequently we have also been commissioned to provide Transport Assessments for the first 3 buildings, including Building C (now known as “The

View Details

Waterloo Road