The Mamre Road Precinct (MRP) forms part of the Western Sydney Employment Area (WSEA) and Aerotropolis was rezoned in June 2020 to permit industrial land uses across approximately 850 hectares of land and over 3.5 million square metres.

Ason Group was engaged to work with key stakeholders including Transport for NSW (TfNSW), the Department of Planning Industry and Environment (DPIE) to formulate a road network plan to accommodate the future demands of the precinct which included up to 100,000 vehicles per day and the development of a future Intermodal Terminal.  

This includes the development of a mesoscopic and microscopic hybrid Aimsun model to test varying land use and network options for a 2026, 2031 and 2036 horizon years as well as detailed site master planning across the precinct.  

A review of existing movement patterns within Western Sydney to establish future project demand.

Our work included

  • Prepared in house Land-Use-Development (LUD) model to estimate the precincts' trip generation / attraction.
  • Develop, calibrate and validate the mesoscopic - microscopic 'Hybrid' model in Aimsun of the MRP and surrounding WSEA.
  • Develop, test and refine, a road network that will enable development of the precinct to full Project capacity whilst maintaining safe and efficient access for all users. 
  • Carry out numerous geometric scenarios assessment for 2026, 2031 and 2036 horizon years including both funded and planned infrastructure.
  • Develop travel demand management (TDM) strategy to reduce travel demand and redistribute the traffic in horizon years.
  • Support public sector to review Draft DCP for Mamre Road Precinct, based on appropriate level of through traffic capacity and staged upgrades.   
  • Provide advice on better connectivity between the precinct and other parts of the Western Sydney Employment Area. 
  • Master planning and SSDA input advice. 
  • Construction management strategies.  

Similar Projects

Ason Group was commissioned in 2018 and undertook the necessary assessments in support of the delivery of Santa Sophia Catholic College. The project provides the development of a unique part 5 and part 6 storey building suitable for 1,920 primary and secondary students and a 60 student Catholic Early Learning

View Details

Santa Sophia Catholic College

Ason Group was engaged to undertake the capacity analysis and assess the operational performance of the current and proposed design in terms of Level of Service provided to pedestrian circulation on the block and adjacent streets in Sydney CBD. The Legion pedestrian model was developed to perform virtual experiments on

View Details

Pitt Street Modelling

Ason Group was commissioned to prepare a Transport Management & Accessibility Plan (TMAP) in support of a Planning Proposal at 26 Kissing Point Road and 266 Victoria Road, Parramatta. The Planning Proposal provides for: 2,700 new dwellings. 5,000m2 of retail and commercial floor space. Community facilities, including open space, accessible

View Details

FACS