Liverpool Private Hospital

Ason Group assisted a Planning Proposal submission in relation to a new Private Hospital at 61-71 Goulburn Street, Liverpool. The Concept Plan developed by Team2 and RobertsDay proposes a 20-storey healthcare facility opposite the existing Liverpool Public Hospital. It envisages:

  • 32,280m 2 GFA of building area, including approximately 353m 2 of ancillary retail on the ground level
  • 4 basement levels, with a total of 327 car parking spaces and basement level loading facilities
  • Ground level porte-cochere drop-off zone, including ambulance parking
  • Podium level pedestrian bridge between the proposed Private Hospital and Liverpool Public Hospital opposite.

Our work included

  • Comprehensive review of earlier traffic assessments in the locality to establish baseline conditions. 
  • High-level advice during early stages to guide Concept Plan development in relation to site access and on-site design 
  • Further detailed review of on-site parking and loading facilities, including swept paths
  • Pedestrian crossing “warrant” analysis 
  • Detailed SIDRA Network modelling to establish future network operations, having regard for cumulative developments proposed in the area.
  • Preparation of a Transport Impact Assessment to support the Planning Proposal submission.

Similar Projects

Ason Group was commissioned to prepare a Transport Assessment in support of a State Significant Development known as the Kemps Creek Warehouse, Logistics and Industrial Facilities Hub. The development provides for: 18 warehouse and distribution lots, with a combined gross floor area of 421, 820m2 Staged delivery of infrastructure Local

View Details

Kemps Creek Warehouse and Logistics Hub

Project EOS refers to a proposed data centre that is currently being developed by Goodman located in Artarmon. The site provisions for: 80MVA power capacity 33 at-grade car parking spaces 2 loading docks 5 levels of technical data hall floor space Ason Group assisted Goodman in preparing a Transport Accessibility

View Details

Artarmon Data Centre (Project EOS)

Ason Group was originally commissioned in 2017 to undertake the development assessment of the Master Plan for 45-61 Waterloo Road Macquarie Park, providing for some 117,000m2 of commercial GFA.Subsequently we have also been commissioned to provide Transport Assessments for the first 3 buildings, including Building C (now known as “The

View Details

Waterloo Road