Amazon Industrial Facility

The Oakdale Estate owned by Goodman is strategically located across both Kemps Creek and Eastern Creek and forms part of the Western Sydney Employment Area (WSEA) lands.

The Amazon Australia site provides for:

  • ~200,000m2 of gross floor area warehouse and office development.
  • 1,127 on-sire car parking spaces.
  • 128 bicycle spaces and 54 motorcycle spaces.
  • 61 loading / unloading facilities

Amazon Australia is known as the largest robotic warehouse in Australia which would be filled with ~11 million shopping products on the back of the country’s e-commerce boom!

Our work included

  • Review performance of the planned infrastructure to support the future development traffic.
  • Future trip demand analysis for the OWE including Amazon site.
  • Transport Modelling to identify adequacy of the future road corridor designs including the Southern Link Rd, Lenore Drive.
  • Parking demand forecasts to meet the needs of the precinct.
  • Development of a Green Travel Plan to promote "other" modes of transport.
  • Construction Traffic Management to support the development of the precincts.

Similar Projects

Ason Group was originally commissioned in 2017 to undertake the development assessment of the Master Plan for 45-61 Waterloo Road Macquarie Park, providing for some 117,000m2 of commercial GFA.Subsequently we have also been commissioned to provide Transport Assessments for the first 3 buildings, including Building C (now known as “The

View Details

Waterloo Road

Ason Group has been engaged to undertake Traffic Modelling Assessment as a part of Transport Management & Accessibility Plan (TMAP) in support of the State Significant Development Application (SSDA) proposal for an industrial warehouse development at 1-3 Burrows Road, St Peters. Traffic Modelling Assessment was prepared to address the relevant

View Details

Burrows Road Traffic Modelling Assessment

Project EOS refers to a proposed data centre that is currently being developed by Goodman located in Artarmon. The site provisions for: 80MVA power capacity 33 at-grade car parking spaces 2 loading docks 5 levels of technical data hall floor space Ason Group assisted Goodman in preparing a Transport Accessibility

View Details

Artarmon Data Centre (Project EOS)