Kemps Creek Warehouse and Logistics Hub

Ason Group was commissioned to prepare a Transport Assessment in support of a State Significant Development known as the Kemps Creek Warehouse, Logistics and Industrial Facilities Hub.

The development provides for:

  • 18 warehouse and distribution lots, with a combined gross floor area of 421, 820m2
  • Staged delivery of infrastructure
  • Local road connectivity to adjoining precincts

Our work included

  • Demand and network capacity analysis.
  • SIDRA network assessment of the Mamre Road corridor, with Options testing to identify relevant trigger points for staged infrastructure delivery.
  • Further sensitivity analysis of future connections to adjoining lots.
  • Detailed design assessment of each lot within the estate, including swept path and Australian Standards assessment.
  • Consultation with Transport for NSW, including Mamre Road Upgrade and Southern Link Road project teams.

Similar Projects

Ason Group has been involved with further design development of the Edmondson Park Town Centre to support the lodgement of a Section 75W application to the Planning Assessment Commission (PAC). The development of the town centre would provide for approximately 3,500 dwellings and 40,000m2 of commercial floor space to the

View Details

Edmondson Park Town Centre

The Master Plan Ason Group was commissioned to prepare a Transport Assessment in support of a Master Plan for the Coffs Harbour Cultural & Civic Space in the centre of the Coffs City Centre. The Master Plan provides for A Regional Museum and Gallery, a Regional Library, a Regional Gallery,

View Details

Coffs Harbour Cultural & Civic Space

The Horsley Drive Business Park – Stage 2 is a multi-stage industrial precinct for some 88,700m2 GFA, across 226,092m2 of site area. Ason Group has been involved in the project since the start with the Concept Plan for Western Sydney Parklands Trust, prior to the site being purchased by Charter

View Details

Horsley Drive Business Park – Stage 2