Victoria Road Corridor Analysis

Survey using Unmanned Aerial Vehicles (Drone) and TomTom GPS.

Real-time traffic data and impact forecasts.

Our work included

  • Telemetric data processing by Artificial Intelligence, including Operational Data (e.g. turn counts, queue length, signal phasing / timing, origin-destination) and Dynamic Behavioural Data (e.g. speed profile, acceleration, weaving, gap acceptance, headways, reaction time, lane utilisation, merging and diverting).
  • High quality video / images to demonstrate interaction amongst road users.
  • Calibration of traffic operation models.
  • Pinch point corridor analysis and speed profiles using historical data.

Similar Projects

Ason Group was engaged by TfNSW to undertake multiple ITAP assessments including over 30 intersections and corridors across a range of locations in NSW. Ason Group proposed and successfully implemented the use of drone technology to record intersection operations and deliver a greater level of traffic movement insights not previously

View Details

Integrated Transport Action Plan (ITAP)

At 240 hectares, ESR’s Moorebank Intermodal Precinct is Australia’s largest intermodal facility. Conveniently located on Moorebank Avenue 1 kilometre south of the M5 Motorway interchange, the facility is ideally situated for the distribution of goods both regionally and nationally via the road and rail networks. Due to its favourable location

View Details

Moorebank Intermodal Precint

Ason Group was originally commissioned in 2017 to undertake the development assessment of the Master Plan for 45-61 Waterloo Road Macquarie Park, providing for some 117,000m2 of commercial GFA.Subsequently we have also been commissioned to provide Transport Assessments for the first 3 buildings, including Building C (now known as “The

View Details

Waterloo Road