Enfield Intermodal Logistic Centre

The Enfield ILC development has been the subject of a Major Project assessment and approvals under the previous Part 3A.  Ason Group’s ongoing responsibility on this project includes the traffic and transport modelling of both on and off-site vehicle movements and necessary analysis and detailed design works for each warehouse / industrial precinct within the Enfield ILC.

Ason Group has also prepared necessary construction certificate documents including Construction Traffic Management Plans (CTMPs), Local Area Traffic Management Plan (LATM) for this site.  The LATM objectives include detailed review of the adequacy and efficiency of the existing and future movements throughout the Estate and provision of road and infrastructure design in accordance with Australian Standards and Austroads Guidelines to improve the operations, efficiency and safety for the Estate users.  

Detailed Transport Modelling of existing and future traffic flows to support MOD 14 approval and to identify road network changes to accommodate the intermodal traffic.

Our work included

  • An assessment of parking demand forecasts and to meet the needs of the proposal.
  • Preparation of a Construction Certificate documents for the proposed warehouses on EILC.
  • Preparation of a Land-Use Development Model to assess the future operational traffic projections and assess with the approved traffic threshold monitoring process for the Estate.
  • Preparation of a Local Area Traffic Management Plan (LATM).
  • Review Cosgrove Road / Turnout Drive design standard to limit truck entry from Punchbowl Road and meet relevant Condition of Consent.

Similar Projects

Ason Group was engaged by Haben Property Fund to prepare a Traffic Impact Assessment to support a Planning Proposal for a mixed-use development at 33-43 Phillip Street, St Marys. Further to a proposed amendment to existing FSR provisions, the Site provides an indicative yield of: 584 residential units. 2,200m² GFA

View Details

Station Plaza St Marys

Ason Group was commissioned to examine potential locations for a new Community Hub within the Western Sydney Parklands at Hoxton Park. The Hub provides for a High School, medical centre, a Retirements & Aged Care Facility and new sporting and recreational facilities. Consideration of the significant changes to local conditions

View Details

Western Sydney Parklands Hubs

Ason Group was commissioned in 2018 and undertook the necessary assessments in support of the delivery of Santa Sophia Catholic College. The project provides the development of a unique part 5 and part 6 storey building suitable for 1,920 primary and secondary students and a 60 student Catholic Early Learning

View Details

Santa Sophia Catholic College