Moorebank Intermodal Precint

At 240 hectares, ESR’s Moorebank Intermodal Precinct is Australia’s largest intermodal facility. Conveniently located on Moorebank Avenue 1 kilometre south of the M5 Motorway interchange, the facility is ideally situated for the distribution of goods both regionally and nationally via the road and rail networks. Due to its favourable location the facility already counts Kmart, Woolworths & Mainfrieght amongst its tenants.

  • 850,000 m2 of industrial & warehousing GFA
  • 1.55 million TEUs of container freight throughput

Our work included

  • A complete due diligence review of the traffic engineering and transport planning that has informed current approvals.
  • Due diligence traffic analysis, including Aimsun micro-simulation modelling, for prospective tenants.
  • SIDRA modelling to test the staged and ultimate delivery of infrastructure requirements.
  • Construction & Operational Traffic Management planning, including site inspections, to ensure safety compliance.
  • Implementation of a vehicle monitoring system using video analytics to ensure compliance with DPHI conditions.

Similar Projects

Ason Group has been involved with further design development of the Edmondson Park Town Centre to support the lodgement of a Section 75W application to the Planning Assessment Commission (PAC). The development of the town centre would provide for approximately 3,500 dwellings and 40,000m2 of commercial floor space to the

View Details

Edmondson Park Town Centre

Ason Group was engaged by TfNSW to undertake multiple ITAP assessments including over 30 intersections and corridors across a range of locations in NSW. Ason Group proposed and successfully implemented the use of drone technology to record intersection operations and deliver a greater level of traffic movement insights not previously

View Details

Integrated Transport Action Plan (ITAP)

Project EOS refers to a proposed data centre that is currently being developed by Goodman located in Artarmon. The site provisions for: 80MVA power capacity 33 at-grade car parking spaces 2 loading docks 5 levels of technical data hall floor space Ason Group assisted Goodman in preparing a Transport Accessibility

View Details

Artarmon Data Centre (Project EOS)