Kemps Creek Warehouse and Logistics Hub

Ason Group was commissioned to prepare a Transport Assessment in support of a State Significant Development known as the Kemps Creek Warehouse, Logistics and Industrial Facilities Hub.

The development provides for:

  • 18 warehouse and distribution lots, with a combined gross floor area of 421, 820m2
  • Staged delivery of infrastructure
  • Local road connectivity to adjoining precincts

Our work included

  • Demand and network capacity analysis.
  • SIDRA network assessment of the Mamre Road corridor, with Options testing to identify relevant trigger points for staged infrastructure delivery.
  • Further sensitivity analysis of future connections to adjoining lots.
  • Detailed design assessment of each lot within the estate, including swept path and Australian Standards assessment.
  • Consultation with Transport for NSW, including Mamre Road Upgrade and Southern Link Road project teams.

Similar Projects

The Horsley Drive Business Park – Stage 2 is a multi-stage industrial precinct for some 88,700m2 GFA, across 226,092m2 of site area. Ason Group has been involved in the project since the start with the Concept Plan for Western Sydney Parklands Trust, prior to the site being purchased by Charter

View Details

Horsley Drive Business Park – Stage 2

Ason Group has been involved with further design development of the Edmondson Park Town Centre to support the lodgement of a Section 75W application to the Planning Assessment Commission (PAC). The development of the town centre would provide for approximately 3,500 dwellings and 40,000m2 of commercial floor space to the

View Details

Edmondson Park Town Centre

Ason Group was engaged by Haben Property Fund to prepare a Traffic Impact Assessment to support a Planning Proposal for a mixed-use development at 33-43 Phillip Street, St Marys. Further to a proposed amendment to existing FSR provisions, the Site provides an indicative yield of: 584 residential units. 2,200m² GFA

View Details

Station Plaza St Marys