FACS

Ason Group was commissioned to prepare a Transport Management & Accessibility Plan (TMAP) in support of a Planning Proposal at 26 Kissing Point Road and 266 Victoria Road, Parramatta.

The Planning Proposal provides for:

  • 2,700 new dwellings.
  • 5,000m2 of retail and commercial floor space.
  • Community facilities, including open space, accessible bushland reserve.

Our work included

  • The development of an Aimsun model in line with RMS Traffic Modelling Guidelines, including Base Model development, calibration and validation. Subsequent Option Testing included various access and land use scenarios, including the provision of a new secondary school.
  • Demand analysis of the precinct including possible light rail options.
  • Data collection including traffic, travel time and Origin-Destination surveys.
  • Detailed assessment of available internal and external access options, in a network constrained by existing grade-separated junctions.
  • Consultation with the Transport for NSW throughout the assessment, including the Parramatta Light Rail team.

Similar Projects

Port Botany in Banksmeadow is Australia’s primary port for bulk liquid and gas and is home to New South Wales largest container facility. Ason Group was commissioned to prepare a 12-hour Aimsun microsimulation model for Coal Pier Road Industrial Precinct located in the vicinity of Port Botany. Freight movements are

View Details

Port Botany & Foreshore Drive Aimsun Model

At 240 hectares, ESR’s Moorebank Intermodal Precinct is Australia’s largest intermodal facility. Conveniently located on Moorebank Avenue 1 kilometre south of the M5 Motorway interchange, the facility is ideally situated for the distribution of goods both regionally and nationally via the road and rail networks. Due to its favourable location

View Details

Moorebank Intermodal Precint

Ason Group was engaged by TfNSW to investigate the Southern Link Road (SLR) design and upgrade options to carry out the concept design, environmental assessment, detailed design and staging for SLR. The concept design has been divided into three stages. Stage 1 connects Mamre Road to Compass Drive Stage 2

View Details

Southern Link Road Corridor Concept Design