Oakdale Estate Industrial Precinct

The Oakdale Estate is strategically located across both Kemps Creek and Eastern Creek and forms part of the Western Sydney Employment Area lands .  Ason Group has been involved in the project since 2014 and has prepared the necessary assessments relating to the Major Project and site specific Development Applications for the Eastern, Southern and Western precincts. 

These precincts include approximately 250ha of developable area for industrial land uses with an end value in excess of $5 billion.

Working with State and Local Government and other relevant authorities for the design and delivery of relevant infrastructure to support the future development.

Our work included

  • Strategic Transport Modelling to identify infrastructure requirements relating to existing and future road corridors including the Southern Link Road, Lenore Drive, M4 and M7 motorways.
  • Future trip demand analysis for the precinct across multiple modes.
  • Precinct and regional freight demand analysis.
  • Parking demand forecasts to meet the needs of the precinct.
  • Identification of Sustainable Transport options for inclusion.
  • Construction Traffic Management to support the development of the precincts.
  • Detailed site specific designs for Toyota, Coles, Costco, DHL, Iron Mountain and others.

Similar Projects

Project EOS refers to a proposed data centre that is currently being developed by Goodman located in Artarmon. The site provisions for: 80MVA power capacity 33 at-grade car parking spaces 2 loading docks 5 levels of technical data hall floor space Ason Group assisted Goodman in preparing a Transport Accessibility

View Details

Artarmon Data Centre (Project EOS)

Ason Group has provided Sekisui House with traffic and transport services for the Sanctuary site at 14-16 Hill Road, Wentworth Point since the site was acquired from Urban Growth in 2017. A predominantly residential development providing up to 2,300 dwellings, the site is located immediately adjacent to the Sydney Olympic

View Details

Sanctuary at Wentworth Point

The Enfield ILC development has been the subject of a Major Project assessment and approvals under the previous Part 3A. Ason Group’s ongoing responsibility on this project includes the traffic and transport modelling of both on and off-site vehicle movements and necessary analysis and detailed design works for each warehouse

View Details

Enfield Intermodal Logistic Centre